Hi,
We are getting new hardware and at the same time want to move from BO4 SP08 TO BO 4.1 SP03.
We have 2 choices - either move the current virtual server onto the new physical host and patch the existing installation from BO4 SP08 to BO 4.1 SP03 or do a fresh installation of BO 4.1. SP03.
In some ways would like to do brand new fresh install on the live server and migrate the content from the old to the new server.
However we have a lareg number of reports and the lcmbiar option would be too slow based on previous experience seeing it takes long time to migrate reports.
Is there a quicker way - one way I thought about was using the upgrade management tool - would thi sbe possible.
Export all the content to biar and reimport thebiar file.
understand cannot use upgrade management tool unless diffferent versions but given we are moving from bo4 to bo 4.1 would this work?
Also heard there is a -noversioncheck switch can use - though not sure is supported.
Ideally want to keep any downtime to a minimum as this is a live system.
Thanks