Hi,
I've been encouraged to upgrade my BI environment from 4.0 SP3 to 4.1.
Usually, (for other software), I would upgrade my non-production environment first, then upgrade my production environment at a later date.
If I upgrade my nonprod environment to 4.0, will I still have the power to promote to my 4.1 environment?