Hi,
Webi job failed email notification for daily scheduled jobs, email count goes more than 2000.
Operating System Details:
- Windows 2008 R2
SAP Business Objects Details:
- SAP BO 4.0 SP6
Database Details:
- CMS DB Oracle 11.2.1.0
Issue description:
On daily basis 100 jobs are scheduled using event file. All 100 jobs start after BW data load completion.
Below is the process for webi job schedule start.
1) BW job complete
2) Event file update on shared location
3) Webi job scheduling starts.
Till april 1st week all 100 jobs were scheduled succesfully and we recieved 101 notification, 1 extra mail for event file notification.
But from last week we recieved more than 2000 mail and on subsequent retry all jobs were scheduled succesfully.
We check the CUID in query builder, but only data for 16 jobs was available, and in instance manager we got 300 failed instances of 16 jobs, but those jobs were executed successfully after multiple reattempt.
Below is the error mentioned in instance manger for all 300 instances:
"Object could not be scheduled within the specified time interval".
Note : Due to unavailablity of trace log, we cannot enable the trace log in enviornment.
Thanks,
Vizit Yadav