Here is the story:
I opened a Webi report in BI 4.1 SP1 Patch 3 environment using BICS connection on top of BEx query from a BW 7.3 EhP2 SP6 system.
After i entered the input prompt values via launchpad i realized the prompts i entered were wrong. I tried canceled the processing.
But, for sometime - the processing wheel was still running and simultaneously i checked the SM66 work process overview screen. I see the work process is still running with my user id.
Which is not convincing !!
After a while, i closed the tab where the report was opened to make sure it should cancel the BW work process but surprisingly, it's still going on !!
Which is annoying!!
Do you know why this could happen. Is there a BW,BO handshaking issue ? or BICS ?
Thanks,
Tilak