Thanks in Advance.

 

As a part of BIP implementation  Transporting the objects from one Environment to another ( Dev / Qas /Prd ).

 

Earlier with the version 3.x , there is an option to change the connection in the UDT ( UNIVERSE DESIGN TOOL ) , now with Promotion management in the BI 4.1 which method to follow to change the connection when move to next enviroment.

 

Eg : Webi report developed in Dev , transported to Qas. When it arrived in Qas from which option can able to change the connection. There is option Override settings. But need to know how it works when transporting the objects.